Skip to main content

Huge three story house in the capital Sofia

We offer you the perfect investment property.

The residential building is designed with four floors - one underground level and three above ground. The first level is almost entirely underground. It can be reached by an internal and external staircase. It comprises of a gym, a hallway, a basement, a boiler room, storage room and a toilet. The second level comprises of an entrance hall, a spacious living room, a dining room, a kitchen with a closet, two bedrooms, a bathroom and a toilet. A staircase from the living room leads to the third level, which has a small living room, four bedrooms, four bathrooms, a closet and a laundry room. The fourth level is a roof terrace.

The house is located in Knyazhevo, which is a luxury district of Sofia and offers easy access to Boyana, as well as to the center of the capital.

Technical details:

  • Built area: 151 sq.m.
  • Total living area: 616 sq.m.
  • Above ground floors: 3
  • Rooms: 9
  • Bedrooms: 6
  • Balconies / Terraces: 4
  • Verandas: 1
  • Bathrooms: 7


ID: 14707
Property Status:  Sold
District:  Sofia
Price Euro:  €517,500
Price GBP:  £439,875
Price USD:  $527,850
Category:  Houses
Area :  3 Floors
Bedrooms: 5+ Bedroom
Living area: 616 m 2
Plot Size :  605m 2
Extras:  Electricity, Water
Location:  In the capital Sofia
Published:  Thursday, January 28, 2021
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

Bulgaria Property Fund Sells Unfinished Office Building For 17.5m Euro 20/03/2008
Bulgaria Property Fund (BPF) has concluded a preliminary contract for the sale of an office building on Sofia’s G.M. Dimitrov Boulevard for 17.5 million euro, excluding value-added tax, to be paid in instalments tied to the stage of completion of the building, Dnevnik daily reported. The buyer... more
 
The Metro station next to airport Sofia will be ready earlier 09/12/2013
The Metro station, which is being built next to Terminal 2 at Sofia Airport will be an early finish. Currently, 70% of the station is built. It is expected the work on the infrastructure activities to end entirely at the end of January 2014. "If the winter is on our side, all construction... more