We offer holiday apartments located a few minutes walking to the sea. The building is situated in the town of Pomorie some 100 m far from the beach and 200 m away from the centre of town. There are many shops, banks, polyclinic, drug-stores, a bus station and a post office in close vicinity.
The housing spreads on area of 1203 sq m, with build up area of 715 sq m. The total living area is 4866 sq m, 715 sq m of which are shops.
The building comprises 3 sections - A, B and C.
SECTION A- Basement consists of entrance-hall, stair-hall, one elevator and 5 shops. The residential floors consist of 6 apartments - 4 one-bedroom, 1 two-bedroom and 1 studio. The mansard floor consists of 4 apartments with large terraces.
SECTION B- Basement consists of entrance-hall, stair hall, one elevator, restaurant and two shops with WC. The three residential floors include 2 studios and 3 one-bedroom apartments. The 5th floor consists of 2 one-bedroom, 1 two-bedroom apartments. The mansard floor consists of 2 apartments with large terraces.
SECTION C- Basement consists of entrance-hall, stair-hall, 1 elevator and 3 shops. The residential floors consist of 3 apartments - 2 one-bedrooms and 1 two-bedroom. The 5th floor has 3 one-bedroom apartments. The mansard floor consists of 1 apartment with large terraces.
The build is projected with solid construction from reinforced concrete. The roof is flat. The outer walls has 25 cm brick construction along with 6 cm of effective heat isolation the same which is the foundation of the balconies.
It will have all necessary electrical, water-main, system of sewers, telephone, chimney, lightning-conduction and internet installations.
Payment plan:
- 80% - upon signing the preliminary contract;
- 10% - upon getting Act 15
- 10% - upon transferring the property
Prices:
Option 1 - "up to pipe plug" prices without VAT - apartments from 735 to 876 euro per sq m.
Option 2 - " turnkey" prices without VAT - apartments - from 895 to 1032 euro per sq m.
Option 3 - "turnkey" prices including VAT.
Progress - Completed construction
Completion date - May 2010