Skip to main content

Rural house for sale at the foot of the mountain

The house is in a picturesque village nestled at the foot of the beautiful Rhodope mountain. The village lies in the Asenovgrad municipality, Plovdiv district. The town of Asenovgrad is about 20 km away.

The property is in the center of the village, behind the town hall. The access is via an asphalted road. There is electricity and water inside the house. The house is built of stone and brick, wooden beams between the floors and the roof. The property is surrounded with a stone fence of about 1.20 m high. The house has not been used for about 5-6 years and requires repairs.

The distribution inside is the following:

On the first floor there is a kitchen, a bedroom and a room that is used as a basement. The second floor has three bedrooms. Exterior staircase connects the floors. The first floor and the second floor have different entrances, which makes the house suitable for two families.

The total built area is 58 square meters.

The yard is 744 sq.m. Was not maintained for the same period as the house.



ID: 13640
Property Status:  Sold
District:  Asenovgrad
Price Euro:  €9,600
Price GBP:  £8,160
Price USD:  $9,792
Category:  Houses
Area :  2 Floors
Bedrooms: 4 Bedroom
Living area: 58 m 2
Plot Size :  744m 2
Extras:  Electricity, Water
Location:  In vacation place
Published:  Wednesday, July 29, 2020
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

168 Million Invested In Mall Construction In Bulgarias Capital 10/03/2008
A new trade centre will be constructed in Sofia’s Malinova Dolina residential district opposite Business Park Sofia. Investment will total 168 million euro, the investor in the project Forum Sofia Ltd said as quoted by investor.bg. Trade centre Forum Sofia will cover an area of 170 000 sq m.... more
 
The Metro station next to airport Sofia will be ready earlier 09/12/2013
The Metro station, which is being built next to Terminal 2 at Sofia Airport will be an early finish. Currently, 70% of the station is built. It is expected the work on the infrastructure activities to end entirely at the end of January 2014. "If the winter is on our side, all construction... more