Architecture:
The complex embodies the idea of an urban dwelling for exacting clients with an active lifestyle: a luxury building offering functionality and comfort, as well as peace and quiet, security and green surroundings.
This luxury building has modern, flying architecture which combines a suspended façade made of ceramic tiles, structural plaster, French windows and glass parapets. Rising 7 floors above the ground, with a total built-up area of 3,500 sq m, the building stands out in the area due to its unique and original exterior.
The complex has an underground car park, a ground floor with 3 shops, a ground-floor apartment with a garden, as well as six floors with a total of 30 functionally laid out apartments. The top-floor apartments overlook the Vitosha Mountain and the city and have spacious open balconies. The entrance hall was done according to a luxury designer project and is very original. The underground floor is directly connected to the residential area and has a sufficient number of parking spaces.
Shops and Apartments:
The complex has thirty-one two- or three-room apartments sharing the same entrance hall with luxury common areas and a hydraulic elevator for 6 people. The ground-floor apartment has its own garden, and the top-floor apartments have panorama-view balconies.
The ground floor has three shops facing the main street. Each has its own entrance and is designed as an open space which can serve various purposes.
Surroundings:
The complex has its own recreation courtyard with seating, as well as a playground with a sandbox, a slide and a swing. The yard has been planted with native trees, shrubs and grasses according to a project. The pathways are made of slabs and the sidewalks of decorative concrete. The courtyard is enclosed and only residents have access to it.
Security and Maintenance of Common Areas:
In order to ensure comfort and peace and quiet for the residents, a specialized company will provide manned security (a porter) controlling access to the building and responsible for cleaning the common areas and the underground car park, as well as maintaining the green spaces and cleaning the snow in the winter months.
Construction Completion Date:
October 2011