Skip to main content

House for sale near Pirdop

This is an offer for a rural property for sale, located in the mountains near the town of Pirdop. The house is set in a peaceful village just 8 km from Pirdop and 88 km from Sofia.
 
The property is built on a plot of land with size 1020 sq m and the house has built area of 90 sq m. The house consists of two floors. On the first floor there is a corridor, basement and three rooms. On the second floor there is a living room, bathroom and two more rooms. In the property there is electricity and water. It is surrounded from all sides by massive stone wall.
 
The village is very well developed and has a school, kindergarten, health service, community center, park, 8 shops, 3 restaurants, 6 cafes, hotel, sewer, asphalted streets with sidewalks and everything else needed.
 
It is also 14 km from Koprivshtitsa, 2 km from the dam Dushantsi and 48 km from the town of Karlovo.



ID: 8670
Property Status:  Sold
District:  Sofia
Price Euro:  €18,600
Price GBP:  £15,810
Price USD:  $18,972
Category:  Houses
Area :  2 Floors
Bedrooms: 4 Bedroom
Living area: 180m 2
Plot Size :  1,020m 2
Extras:  Electricity, Water
Location:  Near river, In the mountains, Near lake, In the countryside, Near town, In fishing area, Near highway, In vacation place
Published:  Tuesday, September 5, 2023
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

Piraeus Bank Bulgaria Lends 14 Million Euro To Arco Invests Manastirski Livadi Project 14/03/2008
Arco Invest, a subsidiary of Latvian Arco Investeeringute AS, signed a 14 million euro lending contract with Piraeus Bank Bulgaria for their multi-functional residential-and-office project in Sofia’s Manastirski livadi neighbourhood. The complex will cover a 8 990 sq m plot, located two... more
 
The Metro station next to airport Sofia will be ready earlier 09/12/2013
The Metro station, which is being built next to Terminal 2 at Sofia Airport will be an early finish. Currently, 70% of the station is built. It is expected the work on the infrastructure activities to end entirely at the end of January 2014. "If the winter is on our side, all construction... more